1 00:00:16,470 --> 00:00:14,390 saturn 1 1b quarterly film reports 2 00:00:22,230 --> 00:00:16,480 number 23 covers progress during the 3 00:00:24,150 --> 00:00:22,240 period january february march 1965. 4 00:00:25,750 --> 00:00:24,160 highlighting this report period was the 5 00:00:28,550 --> 00:00:25,760 successful launch and flight of the 6 00:00:30,790 --> 00:00:28,560 eight saturn sa-9 and the equally 7 00:00:33,670 --> 00:00:30,800 successful orbiting of the first pegasus 8 00:00:36,389 --> 00:00:33,680 meteoroid technology satellite in early 9 00:00:39,350 --> 00:00:36,399 january pegasus underwent systems tests 10 00:00:42,470 --> 00:00:39,360 at cape kennedy tests included unfolding 11 00:00:44,790 --> 00:00:42,480 and folding the 96-foot wings following 12 00:00:47,430 --> 00:00:44,800 testing the satellite was placed inside 13 00:00:49,590 --> 00:00:47,440 the apollo boilerplate module and both 14 00:00:51,830 --> 00:00:49,600 items were then moved to the launch pad 15 00:00:54,470 --> 00:00:51,840 and directed atop the vehicle 16 00:00:56,310 --> 00:00:54,480 the major objective of sa-9 was 17 00:00:59,110 --> 00:00:56,320 inserting the pegasus meteoroid 18 00:01:01,270 --> 00:00:59,120 technology satellite into earth orbit 19 00:01:03,510 --> 00:01:01,280 other objectives included testing a 20 00:01:06,310 --> 00:01:03,520 completely closed loop guidance system 21 00:01:09,830 --> 00:01:06,320 for the second time and an iterative 22 00:01:11,429 --> 00:01:09,840 guidance mode for the first time 23 00:01:13,270 --> 00:01:11,439 pre-launch checkout progressed 24 00:01:15,830 --> 00:01:13,280 satisfactorily culminating with a 25 00:01:17,830 --> 00:01:15,840 successful countdown demonstration test 26 00:01:20,149 --> 00:01:17,840 on february 12th 27 00:01:23,030 --> 00:01:20,159 vehicle countdown activities began three 28 00:01:28,710 --> 00:01:23,040 days later liftoff occurred on february 29 00:01:32,789 --> 00:01:30,950 the sa-9 launch marked the eighth 30 00:01:34,789 --> 00:01:32,799 successful flight of the marshall-built 31 00:01:37,109 --> 00:01:34,799 boosters and the fourth straight 32 00:01:38,230 --> 00:01:37,119 successful flight of the douglas s4 33 00:01:40,550 --> 00:01:38,240 stages 34 00:01:42,710 --> 00:01:40,560 the sa-9 booster was the last to be 35 00:01:44,469 --> 00:01:42,720 built at marshall the two remaining 36 00:01:46,149 --> 00:01:44,479 saturn one boosters were built by 37 00:01:48,870 --> 00:01:46,159 chrysler at marshall's michoud 38 00:01:51,910 --> 00:01:48,880 operations the first stage burned for 39 00:01:54,389 --> 00:01:51,920 145 seconds and separation occurred 40 00:01:58,069 --> 00:01:54,399 satisfactorily 41 00:02:00,550 --> 00:01:58,079 the s4 stage burned about 474 seconds at 42 00:02:01,910 --> 00:02:00,560 which time the program's cutoff velocity 43 00:02:04,789 --> 00:02:01,920 was obtained 44 00:02:06,550 --> 00:02:04,799 s4 stage flight was satisfactory the 45 00:02:09,109 --> 00:02:06,560 first flight of an operational 46 00:02:11,670 --> 00:02:09,119 unpressurized type instrument unit was 47 00:02:13,910 --> 00:02:11,680 also successful 48 00:02:16,070 --> 00:02:13,920 the apollo command and service module 49 00:02:18,550 --> 00:02:16,080 was jettisoned from the second stage by 50 00:02:21,190 --> 00:02:18,560 spring mechanisms leaving the pegasus 51 00:02:24,070 --> 00:02:21,200 wings free to unfold as revealed by 52 00:02:26,470 --> 00:02:24,080 onboard tv cameras the wings 53 00:02:29,030 --> 00:02:26,480 successfully deployed to the full open 54 00:02:30,790 --> 00:02:29,040 position pegasus a is presently 55 00:02:34,070 --> 00:02:30,800 obtaining information concerning 56 00:02:36,630 --> 00:02:34,080 quantity size and velocity of meteoroids 57 00:02:39,670 --> 00:02:36,640 in the near earth space 58 00:02:42,229 --> 00:02:39,680 sa-8 and sa-10 will also launch pegasus 59 00:02:44,470 --> 00:02:42,239 satellites work has progressed steadily 60 00:02:46,630 --> 00:02:44,480 on these vehicles 61 00:02:49,589 --> 00:02:46,640 at michoud following completion of 62 00:02:52,470 --> 00:02:49,599 post-static checkout s18 was shipped to 63 00:02:55,589 --> 00:02:52,480 ksc by chrysler arriving at the cape 64 00:02:57,990 --> 00:02:55,599 february 28th it was erected on the pad 65 00:03:00,550 --> 00:02:58,000 march 2. 66 00:03:03,030 --> 00:03:00,560 during pre-launch checkout one defective 67 00:03:06,229 --> 00:03:03,040 engine gas generator was discovered and 68 00:03:08,470 --> 00:03:06,239 all eight were replaced 69 00:03:11,110 --> 00:03:08,480 s 4 8 was flown from the west coast 70 00:03:13,750 --> 00:03:11,120 february 23rd and arrived at the cape 71 00:03:15,509 --> 00:03:13,760 february 25th 72 00:03:18,550 --> 00:03:15,519 checkout and painting of the stage with 73 00:03:21,350 --> 00:03:18,560 a special paint was completed march 11th 74 00:03:23,509 --> 00:03:21,360 the stage was erected atop s18 march 75 00:03:26,070 --> 00:03:23,519 17th 76 00:03:28,949 --> 00:03:26,080 siu8 was delivered to the cape on march 77 00:03:30,309 --> 00:03:28,959 8 by guppy the unit was transported to 78 00:03:32,550 --> 00:03:30,319 hangar af 79 00:03:35,430 --> 00:03:32,560 checkout and alignment were completed 80 00:03:39,030 --> 00:03:35,440 then the unit was painted on march 18 81 00:03:40,710 --> 00:03:39,040 erection of the iu was completed 82 00:03:42,789 --> 00:03:40,720 meanwhile at marshall's michoud 83 00:03:45,750 --> 00:03:42,799 operations chrysler completed 84 00:03:46,550 --> 00:03:45,760 post-static checkout of s110 on march 85 00:03:48,949 --> 00:03:46,560 5th 86 00:03:51,110 --> 00:03:48,959 preparations for shipment to ksc are in 87 00:03:53,830 --> 00:03:51,120 progress 88 00:03:56,710 --> 00:03:53,840 at sacto s410 static firing was 89 00:03:58,869 --> 00:03:56,720 successfully completed january 21st 90 00:04:02,229 --> 00:03:58,879 this firing marks the completion of the 91 00:04:04,710 --> 00:04:02,239 s4 stage static firing program the stage 92 00:04:07,270 --> 00:04:04,720 is in storage at sacto awaiting shipment 93 00:04:10,149 --> 00:04:07,280 to ksc 94 00:04:12,149 --> 00:04:10,159 checkout of siu 10 located at marshall's 95 00:04:14,949 --> 00:04:12,159 quality and reliability assurance 96 00:04:18,310 --> 00:04:14,959 laboratory started in january and is 97 00:04:20,390 --> 00:04:18,320 scheduled to end in early april 98 00:04:22,790 --> 00:04:20,400 satisfactory progress is being made by 99 00:04:25,270 --> 00:04:22,800 the contractor fairchild hiller on 100 00:04:29,030 --> 00:04:25,280 pegasus b and c which will be used for 101 00:04:31,510 --> 00:04:29,040 sa-8 and sa-10 flights 102 00:04:33,510 --> 00:04:31,520 final assembly and checkout on pegasus b 103 00:04:35,590 --> 00:04:33,520 has begun at hagerstown 104 00:04:37,749 --> 00:04:35,600 after vibration testing at general 105 00:04:40,230 --> 00:04:37,759 electric valley forge pennsylvania which 106 00:04:42,950 --> 00:04:40,240 is scheduled for early april the unit 107 00:04:45,430 --> 00:04:42,960 will be flown to the cape 108 00:04:47,909 --> 00:04:45,440 pegasus c structural fabrication is 109 00:04:49,990 --> 00:04:47,919 complete black boxes for the satellite 110 00:04:52,070 --> 00:04:50,000 were still being assembled at the end of 111 00:04:54,310 --> 00:04:52,080 march 112 00:04:56,870 --> 00:04:54,320 the pegasus prototype is being held at 113 00:04:59,510 --> 00:04:56,880 fairchild hiller's hagerstown facility 114 00:05:00,950 --> 00:04:59,520 as a test bed for pegasus b and c 115 00:05:02,790 --> 00:05:00,960 modifications 116 00:05:05,110 --> 00:05:02,800 possible deletion of prototype 117 00:05:10,870 --> 00:05:05,120 environmental tests at general electric 118 00:05:15,749 --> 00:05:13,430 the saturn 1b dynamic test stages were 119 00:05:18,070 --> 00:05:15,759 received at marshall january 4th 120 00:05:19,909 --> 00:05:18,080 arriving on the same barge tone 121 00:05:22,150 --> 00:05:19,919 following receiving inspection of the 122 00:05:24,150 --> 00:05:22,160 chrysler built first stage and the 123 00:05:26,070 --> 00:05:24,160 douglas built second stage they were 124 00:05:27,990 --> 00:05:26,080 erected in the stand 125 00:05:30,230 --> 00:05:28,000 assembly of the dynamic test instrument 126 00:05:31,189 --> 00:05:30,240 unit was completed in early february at 127 00:05:33,189 --> 00:05:31,199 marshall 128 00:05:35,670 --> 00:05:33,199 following installation of simulated 129 00:05:38,390 --> 00:05:35,680 components the unit was installed atop 130 00:05:40,790 --> 00:05:38,400 the s4b dynamic test stage 131 00:05:43,510 --> 00:05:40,800 on january 19th the helicopter 132 00:05:46,310 --> 00:05:43,520 transported spacecraft adapter arrived 133 00:05:49,110 --> 00:05:46,320 at msfc and was subsequently installed 134 00:05:54,790 --> 00:05:52,230 testing of the sa-203 configuration 135 00:05:57,029 --> 00:05:54,800 began february 18th and was completed 136 00:05:59,510 --> 00:05:57,039 march second this configuration 137 00:06:01,510 --> 00:05:59,520 consisted of the first and second stages 138 00:06:03,110 --> 00:06:01,520 the instrument unit and a shroud 139 00:06:05,189 --> 00:06:03,120 simulator 140 00:06:07,749 --> 00:06:05,199 upon completion of the sa-203 141 00:06:10,350 --> 00:06:07,759 configuration testing a spacecraft was 142 00:06:13,670 --> 00:06:10,360 installed atop the test vehicle and the 143 00:06:14,870 --> 00:06:13,680 sa-201 and 202 configuration testing 144 00:06:17,350 --> 00:06:14,880 began 145 00:06:19,749 --> 00:06:17,360 saturn 1b dynamic testing will continue 146 00:06:22,390 --> 00:06:19,759 through next quarter 147 00:06:24,550 --> 00:06:22,400 a major saturn 1b milestone was reached 148 00:06:26,710 --> 00:06:24,560 when the first 1b booster was static 149 00:06:28,950 --> 00:06:26,720 fired at msfc 150 00:06:31,990 --> 00:06:28,960 chrysler completed stage pre-static 151 00:06:34,469 --> 00:06:32,000 checkout at michoud on february 2nd the 152 00:06:35,590 --> 00:06:34,479 stage arrived at marshall by barge march 153 00:06:37,510 --> 00:06:35,600 14th 154 00:06:39,990 --> 00:06:37,520 following installation into the test 155 00:06:42,550 --> 00:06:40,000 stand and preparation for tests the 156 00:06:43,590 --> 00:06:42,560 booster was successfully fired for 35 157 00:06:46,070 --> 00:06:43,600 seconds 158 00:06:48,870 --> 00:06:46,080 a long duration firing is scheduled for 159 00:06:51,830 --> 00:06:48,880 april 13th 160 00:06:54,150 --> 00:06:51,840 at chrysler michoud s1b2 stage assembly 161 00:06:56,469 --> 00:06:54,160 was completed march 1st booster 162 00:06:58,950 --> 00:06:56,479 pre-static checkout began and continued 163 00:07:01,589 --> 00:06:58,960 throughout the quarter 164 00:07:04,550 --> 00:07:01,599 tank clustering for s13 was also 165 00:07:06,870 --> 00:07:04,560 completed their s1v3 assembly operations 166 00:07:08,870 --> 00:07:06,880 continued on schedule and assembly is 167 00:07:10,790 --> 00:07:08,880 expected to be completed early next 168 00:07:12,950 --> 00:07:10,800 quarter 169 00:07:15,909 --> 00:07:12,960 fabrication operations continued for 170 00:07:18,469 --> 00:07:15,919 s1b4 tank clustering is scheduled to 171 00:07:23,189 --> 00:07:18,479 begin early next quarter fabrication 172 00:07:25,589 --> 00:07:23,199 operations are also underway for s1b5 173 00:07:28,150 --> 00:07:25,599 at douglas's sacramento test area the 174 00:07:30,390 --> 00:07:28,160 non-flight j2 engine was removed from 175 00:07:32,710 --> 00:07:30,400 the battleship test stage and replaced 176 00:07:34,710 --> 00:07:32,720 with a flight configuration engine 177 00:07:36,710 --> 00:07:34,720 the new engine has the capacity to 178 00:07:37,670 --> 00:07:36,720 gimbal which is needed for the remaining 179 00:07:39,990 --> 00:07:37,680 tests 180 00:07:42,390 --> 00:07:40,000 engine chill down propellant utilization 181 00:07:44,950 --> 00:07:42,400 tests and hot firings were conducted by 182 00:07:47,350 --> 00:07:44,960 the end of march 183 00:07:50,550 --> 00:07:47,360 a full duration firing was cut off after 184 00:07:53,270 --> 00:07:50,560 29 seconds on march 19th due to a gas 185 00:07:55,350 --> 00:07:53,280 generator body exceeding safe value 186 00:07:57,749 --> 00:07:55,360 a second full duration firing set for 187 00:08:03,270 --> 00:07:57,759 march 25th was rescheduled for early 188 00:08:08,309 --> 00:08:05,430 at huntington beach douglas's structural 189 00:08:10,629 --> 00:08:08,319 test program involving various s4b 190 00:08:14,309 --> 00:08:10,639 components such as this static test 191 00:08:16,230 --> 00:08:14,319 thrust structure was well underway 192 00:08:18,150 --> 00:08:16,240 other items undergoing qualification 193 00:08:21,110 --> 00:08:18,160 testing were the liquid oxygen tank 194 00:08:23,110 --> 00:08:21,120 assembly and an s4b forward skirt which 195 00:08:26,390 --> 00:08:23,120 was tested to failure to determine 196 00:08:28,629 --> 00:08:26,400 maximum load conditions 197 00:08:30,710 --> 00:08:28,639 also at sacto douglas completed 198 00:08:32,389 --> 00:08:30,720 installation of ground support equipment 199 00:08:34,790 --> 00:08:32,399 and instrumentation required for 200 00:08:36,949 --> 00:08:34,800 facilities checkout stage tests on beta 201 00:08:38,949 --> 00:08:36,959 test stand number three 202 00:08:40,790 --> 00:08:38,959 facilities checkout tests were started 203 00:08:44,710 --> 00:08:40,800 in mid-march with propellant loading 204 00:08:46,550 --> 00:08:44,720 tests to be performed early next quarter 205 00:08:49,030 --> 00:08:46,560 checkout of the first flight second 206 00:08:51,110 --> 00:08:49,040 stage s4b1b1 207 00:08:53,829 --> 00:08:51,120 was stopped march 30th 208 00:08:56,230 --> 00:08:53,839 lh2 tanks modifications and installation 209 00:08:58,470 --> 00:08:56,240 of late parts are scheduled prior to 210 00:09:00,470 --> 00:08:58,480 shipping to sakto in april 211 00:09:03,590 --> 00:09:00,480 checkout will be resumed and completed 212 00:09:04,590 --> 00:09:03,600 at sacto after final parts installation 213 00:09:07,750 --> 00:09:04,600 work on 214 00:09:10,550 --> 00:09:07,760 s4b1b2 included welding segments of the 215 00:09:13,190 --> 00:09:10,560 forward and aft common dome and joining 216 00:09:15,269 --> 00:09:13,200 the propellant tanks and skirts systems 217 00:09:17,430 --> 00:09:15,279 checkout for this stage is scheduled for 218 00:09:21,670 --> 00:09:17,440 next quarter 219 00:09:24,310 --> 00:09:21,680 tank insulation of s4b 1b3 and 1v4 was 220 00:09:26,470 --> 00:09:24,320 completed installation of electrical and 221 00:09:28,230 --> 00:09:26,480 mechanical systems on these stages is 222 00:09:31,509 --> 00:09:28,240 underway 223 00:09:33,590 --> 00:09:31,519 at rocketdyne santa susana facility 200k 224 00:09:36,710 --> 00:09:33,600 engine qualification testing started 225 00:09:38,790 --> 00:09:36,720 march 1st is progressing satisfactorily 226 00:09:40,750 --> 00:09:38,800 the first engine has completed 11 227 00:09:43,910 --> 00:09:40,760 calibration tests for 228 00:09:46,949 --> 00:09:43,920 1560 seconds and is currently undergoing 229 00:09:48,470 --> 00:09:46,959 safety limits and malfunction testing 230 00:09:51,509 --> 00:09:48,480 seven calibration tests have been 231 00:09:53,829 --> 00:09:51,519 completed on the second engine for 1085 232 00:09:56,790 --> 00:09:53,839 seconds all tests are scheduled for 233 00:09:58,550 --> 00:09:56,800 completion in early may 234 00:10:00,790 --> 00:09:58,560 following successful completion of 235 00:10:03,350 --> 00:10:00,800 rocketdyne's j2 engine preliminary 236 00:10:05,910 --> 00:10:03,360 flight rating tests last quarter the 237 00:10:07,990 --> 00:10:05,920 test engine was removed from the stand 238 00:10:10,470 --> 00:10:08,000 it was completely disassembled then 239 00:10:12,389 --> 00:10:10,480 inspected at the canoga park facility to 240 00:10:15,509 --> 00:10:12,399 determine the extent of engine wear 241 00:10:17,910 --> 00:10:15,519 after repeated firings 242 00:10:20,230 --> 00:10:17,920 at santa susana acceptance testing of 243 00:10:23,190 --> 00:10:20,240 the first j-2 flight configuration 244 00:10:25,190 --> 00:10:23,200 engine was conducted january 22nd the 245 00:10:28,069 --> 00:10:25,200 following day the engine was delivered 246 00:10:32,069 --> 00:10:28,079 to douglas for use in its s4b battleship 247 00:10:36,310 --> 00:10:34,389 at santa susana major modifications on 248 00:10:39,030 --> 00:10:36,320 vertical test stance number three are 249 00:10:41,509 --> 00:10:39,040 now complete the stand reactivated in 250 00:10:43,350 --> 00:10:41,519 january will provide improved propellant 251 00:10:45,350 --> 00:10:43,360 conditioning and increased overall 252 00:10:48,310 --> 00:10:45,360 utility 253 00:10:50,310 --> 00:10:48,320 at msfc beneficial occupancy of the j-2 254 00:10:51,430 --> 00:10:50,320 engine test facility came about in 255 00:10:52,949 --> 00:10:51,440 january 256 00:10:54,550 --> 00:10:52,959 the propellant tanks for the test 257 00:10:56,949 --> 00:10:54,560 facility have been installed in the 258 00:10:58,790 --> 00:10:56,959 stand with testing scheduled for next 259 00:11:00,550 --> 00:10:58,800 quarter 260 00:11:02,630 --> 00:11:00,560 meanwhile at wiley laboratories 261 00:11:05,509 --> 00:11:02,640 huntsville instrument unit vibration 262 00:11:07,509 --> 00:11:05,519 testing got underway in february testing 263 00:11:09,509 --> 00:11:07,519 will determine the ability of the iu 264 00:11:11,110 --> 00:11:09,519 structure to withstand anticipated 265 00:11:12,790 --> 00:11:11,120 flight environment 266 00:11:15,910 --> 00:11:12,800 assembly of the structural test 267 00:11:18,310 --> 00:11:15,920 instrument unit was finished 268 00:11:20,310 --> 00:11:18,320 a breadboard version of the iu's launch 269 00:11:21,670 --> 00:11:20,320 vehicle digital computer has been 270 00:11:23,590 --> 00:11:21,680 delivered to marshall by the 271 00:11:25,990 --> 00:11:23,600 manufacturer international business 272 00:11:28,310 --> 00:11:26,000 machines owigo new york 273 00:11:31,030 --> 00:11:28,320 the unit used in guidance operations is 274 00:11:33,030 --> 00:11:31,040 now being checked out and evaluated the 275 00:11:35,829 --> 00:11:33,040 first prototype computer will be 276 00:11:37,910 --> 00:11:35,839 delivered next quarter 277 00:11:40,150 --> 00:11:37,920 at ibm's huntsville facility a 278 00:11:42,069 --> 00:11:40,160 structural assembly fixture a major 279 00:11:44,470 --> 00:11:42,079 piece of hard tooling for use in the 280 00:11:47,030 --> 00:11:44,480 instrument unit assembly was received 281 00:11:48,710 --> 00:11:47,040 and installed 282 00:11:50,870 --> 00:11:48,720 assembly of structural segments 283 00:11:52,870 --> 00:11:50,880 manufactured by general dynamics fort 284 00:11:55,910 --> 00:11:52,880 worth texas for the first flight 285 00:11:58,389 --> 00:11:55,920 instrument unit was completed march 23rd 286 00:12:01,750 --> 00:11:58,399 component assembly started march 24th 287 00:12:04,389 --> 00:12:01,760 and will continue into the next quarter 288 00:12:06,389 --> 00:12:04,399 at ibm space guidance center orwego 289 00:12:07,829 --> 00:12:06,399 radiographic inspection was accomplished 290 00:12:08,870 --> 00:12:07,839 on the first piece of production 291 00:12:11,590 --> 00:12:08,880 hardware 292 00:12:13,150 --> 00:12:11,600 the unit a magnesium casting forms the 293 00:12:15,750 --> 00:12:13,160 base assembly for 294 00:12:18,310 --> 00:12:15,760 siu-201's emergency detector system 295 00:12:20,230 --> 00:12:18,320 distributor machining operations were 296 00:12:22,470 --> 00:12:20,240 also performed on a component of the 297 00:12:25,829 --> 00:12:22,480 guidance and control system for use in 298 00:12:28,389 --> 00:12:25,839 the launch vehicle data adapter 299 00:12:30,629 --> 00:12:28,399 meanwhile at msfc installation of 300 00:12:33,110 --> 00:12:30,639 computer equipment for the saturn 1v 301 00:12:35,350 --> 00:12:33,120 development breadboard continued 302 00:12:37,190 --> 00:12:35,360 some saturn 1b testing with this unit 303 00:12:40,470 --> 00:12:37,200 has already been accomplished with 304 00:12:42,389 --> 00:12:40,480 additional tests scheduled 305 00:12:45,350 --> 00:12:42,399 in summary accomplishments during 306 00:12:47,430 --> 00:12:45,360 january february and march strengthened 307 00:12:50,470 --> 00:12:47,440 the overall enviable record of the 308 00:12:52,629 --> 00:12:50,480 saturn 1 and 1b programs the near 309 00:12:54,550 --> 00:12:52,639 perfect flight of sa-9 310 00:12:58,710 --> 00:12:54,560 preparations for the operational flight 311 00:13:01,110 --> 00:12:58,720 of sa-8 saturn 1b dynamic testing major 312 00:13:03,590 --> 00:13:01,120 buildup of ground support equipment and